What We Do

Services

The full list of deck work we handle, spelled out so you know what you're actually paying for.

HomeServices

Everything we take on

Every job below is one we do ourselves across Mableton.

Deck Installation

We build new decks from the footings up, framed for the load you'll actually put on them, furniture, a hot tub, or a crowd on the Fourth of July. Footings go below grade on undisturbed soil, not poured on top of loose fill, because Georgia clay shifts more than people expect.

Custom Deck Design

Multi-level decks, built-in benches, and layouts that work around an existing tree or a slope in the yard. We draw it out and price the lumber and hardware before anyone picks up a saw.

Deck Repair

Soft or spongy boards, a railing that wobbles, joists that have started to sag, we fix the specific problem instead of talking you into a rebuild you don't need. Sometimes it's one bad joist and a handful of screws, not the whole deck.

Deck Staining & Sealing

Pressure-treated pine and cedar both need a fresh coat every two to three years or the wood grays out, cracks, and starts soaking up water at the end grain. We pressure wash first, let the boards dry fully, then stain, because sealing over damp wood traps moisture underneath.

Composite Decking

Composite boards like Trex or TimberTech don't need staining and won't splinter, but they still need proper joist spacing underneath or they'll flex more than solid wood. We install with hidden fasteners so you don't see a single screw head on the surface.

Deck Replacement

When the framing underneath is too far gone to save, patching it stops making sense. We tear out down to the ledger, check what's salvageable, and rebuild the structure to current code, not whatever code was in place when the old one went up.

Deck Railing Repair & Installation

A wobbly railing is almost always a loose post connection, not a cosmetic problem, and it's the one thing on a deck that actually keeps someone from falling. We rebuild to the 36-inch height and baluster spacing the code requires, whether you want wood, cable, or composite rail.

Deck Resurfacing

If the frame is solid but the boards are shot, we can strip the old decking and lay new boards over the existing joists. It costs less than a full rebuild and gets you a deck that looks new without touching what's underneath.

Pergolas & Screened Porches

Once a deck's built, some people want shade or a screen to keep the bugs out during a Georgia summer. We frame pergolas and screened structures off an existing deck or as part of a new build.

Deck Demolition & Removal

Old deck coming down and you don't want the lumber sitting in your yard for a month, we tear it out and haul it off. This is usually the first step before a rebuild, but we'll do it as a standalone job too.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Mableton, GA

These are the towns where we regularly pull permits and pour footings.

Mableton, GA
Atlanta, GA
Marietta, GA
Smyrna, GA
Douglasville, GA
Kennesaw, GA
Acworth, GA
Villa Rica, GA
Powder Springs, GA
Dallas, GA
Austell, GA
Hiram, GA
Common Questions

Things worth asking

Questions that come up once a deck project actually gets underway.

Do I need a permit to build a deck?
Most decks over 30 inches off the ground require a building permit in Cobb County and surrounding jurisdictions, along with an inspection of the footings before the decking goes down. A licensed deck builder typically pulls the permit and schedules the inspections as part of the job.
How long does a deck installation take?
A standard single-level deck usually takes one to two weeks from footings to final boards, weather permitting. Multi-level decks, built-in seating, or composite decking with hidden fastener systems can add several days to that timeline.
Can you work within a set budget for a deck?
Deck size, decking material, and railing style can all be adjusted to fit a budget, and a contractor should lay out those tradeoffs in the written quote. Pressure-treated pine costs significantly less than composite or cedar, which is usually the first place to adjust.
Do you guarantee your deck work?
Workmanship is typically covered under warranty for a set period after completion, separate from the manufacturer's warranty on materials like composite decking. The specifics should be written into the contract, not just promised verbally.
Will I be dealing with the owner or a project manager during the job?
On most residential deck jobs, the same person who gives the quote is on site running the crew day to day. That makes it easier to answer questions or make small changes without delay.
What materials do you use for decking?
Pressure-treated pine, cedar, and composite brands like Trex and TimberTech are the standard choices for deck boards, each with different upkeep and cost. Framing lumber is pressure-treated regardless of what decking goes on top, since that's what carries the structural load.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during construction, though the immediate work area needs to stay clear for safety and material staging. Pets and kids should be kept away from the site while footings are being dug or lumber is being cut.
How should I prepare before the crew arrives to build a deck?
Clearing furniture, grills, and planters off an existing deck or the build area saves time on day one. Marking the location of any buried sprinkler lines or dog fence wire ahead of time also helps avoid delays.
What if you find a problem once the old deck comes down?
Rotted ledger boards, undersized footings, or a rim joist that's been leaking for years sometimes only show up once the old decking is removed. Any of that gets pointed out with photos and a revised price before work continues, not buried in a final invoice.
How do I take care of a new deck?
Pressure-treated and cedar decks need restaining every two to three years to keep water from soaking into the end grain. Composite decking just needs regular sweeping and an occasional wash to keep mildew from building up in shaded spots.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (770) 790-5367